Skip to main content

Error message

  • The specified file temporary://filesGUQZy could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileCxoaVy could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileZbGHFy could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileLgHQ1w could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filepIDY5y could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filezrUX4v could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filedqv3Bz could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Japan: Tepco has wasted Fukushima cash

JAPANESE government auditors said yesterday that Fukushima nuclear plant operator Tokyo Electric Power (Tepco) has wasted more than a third of the 190 billion yen (£1.07bn) of taxpayer money allocated for cleaning up the destroyed plant.

They also said the clean-up work has been dominated by a small group of utility, construction and electronics giants despite repeated calls for competitive bids.

Tepco spokesman Teruaki Kobayashi insisted all the equipment used had contributed to stabilising the plant.

However, the auditors drew attention to expensive failures including a 32 bn yen (£180 million) machine made by

French firm Areva to remove radioactive cesium from water leaking from the wrecked reactors.

The machine lasted just three months and treated only a tiny fraction of the volume leaking every day.

They also pointed to cooling machines costing 18.4bn yen (£100.7m) from companies including Hitachi, Toshiba and Areva.

One functioned for five days and the longest lasted just six weeks.

OWNED BY OUR READERS

We're a reader-owned co-operative, which means you can become part of the paper too by buying shares in the People’s Press Printing Society.

 

 

Become a supporter

Fighting fund

You've Raised:£ 9,899
We need:£ 8,101
12 Days remaining
Donate today