Skip to main content

Error message

  • The specified file temporary://fileLe1u0z could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileUufMPA could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filebjuIGA could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileNqU9Yx could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileEbLdPA could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file8EvmSz could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileBSfItz could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Labour Conference ’19 CWU tables vote for a Labour four-day week policy

THE Communication Workers Union (CWU) has successfully tabled a motion to Labour conference that would push the party to fight for a four-day working week.

The postal workers and communications union will put forward the motion “A four-day week for a fairer, more sustainable society” to delegates meeting in Brighton next week.

The motion, which points out that Britain has “some of the worst public and statutory holiday entitlements” in Europe, says that Labour should campaign to achieve either a 32-hour gross week or a standard four-day working week within the next decade.

It notes that Labour has already pledged to introduce four new public holidays, but pushes for the party to “go beyond” its previous proposals.

It says that this would be a proper response to new technology and automation and would redress the current “intensification of work,” which has “not delivered benefits to workers.”

Included in the demands are that the change would not mean a loss of pay for workers and that sectoral collective bargaining would be guaranteed in workplaces.

A similar motion has also been put forward by the Labour 4 Day Week campaign, which calls for a recognition of the “growing consensus around reductions in working time” among trade unions and Labour MPs.

It also urges Labour to include a four day week with no loss of pay in the party’s next election manifesto.

The campaign publicly congratulated the CWU for its motion, which it says has “huge levels of ambition.”

OWNED BY OUR READERS

We're a reader-owned co-operative, which means you can become part of the paper too by buying shares in the People’s Press Printing Society.

 

 

Become a supporter

Fighting fund

You've Raised:£ 9,899
We need:£ 8,101
12 Days remaining
Donate today