Skip to main content

Error message

  • The specified file temporary://fileipQ70B could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filexzk4VE could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filejee8uF could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file4wUXqF could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://filev1dIxE could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://file8MCn1C could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
  • The specified file temporary://fileHo4CuE could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

16,000 shipbuilding jobs at risk if government does not renew contract

MORE than 16,000 shipbuilding jobs are at risk if the government chooses not to renew a contract to build new military support ships, the GMB has warned.

The union has said it’s a “no-brainer” for Defence Secretary Penny Mordaunt to ensure that £1 billion of government funds go to renewing the Fleet Solid Support in order to keep Britain’s shipbuilding industry buoyant.

If the government chooses not to go ahead with building the ships, analysis from the Ministry of Defence itself estimates that approximately 16,400 jobs across the country would be lost.

The new fleet is needed to service Britain’s £6.3 billion Queen Elizabeth-class aircraft carriers, and their strike force of F-35 fighter jets.

The news comes as the all-party parliamentary group on shipbuilding and ship repair urged the government to keep the contract in British hands.

GMB national officer Ross Murdoch said: “We have a highly skilled shipbuilding workforce in the UK that is more than capable of making these ships at a fair market price.

“We can’t let our proud shipbuilding tradition be sold down the river if the work goes to artificially subsidised international competitor shipyards instead.”

OWNED BY OUR READERS

We're a reader-owned co-operative, which means you can become part of the paper too by buying shares in the People’s Press Printing Society.

 

 

Become a supporter

Fighting fund

You've Raised:£ 9,899
We need:£ 8,101
12 Days remaining
Donate today